Cold roof insulation between rafters wnapor barrier on warm side below orw sheatiiing roofing roofing 2 x 8 sleepers notched for vent aligned wi rafters flashing over rooang fascia sheatiiing 2 x 4 sleepers aligned w rafters provide.
Shed roof fascia detail.
Henry shows you how to do this in great detail and get perfect results.
Cut your 2 in 5 1 cm x 4 in 10 cm or 2 in 5 1 cm x 6 in 15 cm to match the length of the shed.
Include roof pitch roof geometry slope length and climatic factors such as heavy snowfall or rainfall.
A simple gable shed roof is often built using 2 4 or 2 6 lumber for the rafters and 2 4 for the collar ties.
Other roof protrustions sothat notiiing obstructs tiieflow ofair from eave to ridge.
Once you have the sheathing in place your final task will be to mount fascia boards to cover the exposed ends of your rafters.
Whenever possible begin trim installation at the downwind end of the roof farthest away from the source of prevailing winds to al low flashing laps to face away from wind driven rain.
Refer to the details.
The regulations allowed a storage shed to be built in the side yard backyard or in the rear setback.
This is the finishing part of the shed.
In this video he shows you how to use his exclusive jig to make it easy to install long trim without any help.
The rafters are angle cut at the ridge end and notched with a birdsmouth where it meets the top plate of the supporting wall.
Also the maximum height of a shed measured from ground level to the highest peak of the roof is set at 14 and must never exceed the height of the house.
The drip edge will be installed 1 8 proud of away or out from the furring strip in best practice or may be installed tight against the furring strip reduces the life of the furring strip by rot.
Cad details document name pdf dwg download all cad construction details 37 1 mb 3 4 mb mc01 identification of roof areas 694 kb 167 kb mc01a single layer underlayment 678 kb 302 kb mc01b double layer underlayment 711 kb 322 kb mc02 vent pipe flashing 626 kb 349 kb mc03 valley.
But never over the septic field.
The fascia boards and soffit material installation is very important.